Engineering Logs
Engineering Logs will be graded EVERY day 5/6 (the long block days). Each day you are late submitting your work, a 5 point penalty will be assessed.
MarshmalloW Challenge
Due: Day 5/6 the week of September 11th.
Single Sheet Paper Challenge
Due: No later than September 15th.
Bridge Design
Will be testing on Day 5/6 the week of October 9th.
Catapult Design
Due: By Friday October 20th.
Catapult Prototype
Will be testing ALL prototypes October 27th and October 30
Catapult
Testing will be November 20th and November 21st.